Certification Registry

ABQ Ready Mix

Scale certs · NRMCA · opacity observer
Scale calibration certificate
Home screen and status bar will warn 60 days before expiry
NRMCA plant certification
NRMCA plant certifications are typically annual
Opacity observer certification
Required before recording Method 9 observations. The Opacity Observation form will prompt operators to register here if no certified observer is on file. Observer name and cert number will auto-fill on opacity forms once saved here.
This name will pre-fill automatically when opening an Opacity Observation form
EPA Method 9 observers must recertify — typically every 6 months
Both 1634-RV1 and the 1634-2AR administrative revision letter must be physically posted at the plant — Condition 9
Permit on file
Permit 1634-2AR — Active
Transferred to C&E Concrete, Inc. 2/24/26 · Both 1634-RV1 and the 1634-2AR revision letter must be physically posted at plant — Condition 9
📄
View permit documents
Show inspector or download for field reference